Audit is an evaluation of a person, organization, system,
process, enterprise, project or product. The term most commonly refers to
audits in accounting, but similar concepts also exist in project management, quality
management, and for energy conservation.
Audit is a vital part of accounting.
Audits are performed to ascertain the validity and reliability of information;
also to provide an assessment of a system's internal control. The goal of an
audit is to express an opinion on the person / organization/system (etc) in
question, under evaluation based on work done on a test basis.
Due to practical constraints, an audit
seeks to provide only reasonable assurance that the statements are free from
material error. Hence, statistical sampling is often adopted in audits. In the
case of financial audits, a set of financial statements are said to be true and
fair when they are free of material misstatements - a concept influenced by
both quantitative and qualitative factor.
EXISTING
SYSTEM
At Present all
the activities in transaction are handled by MS-EXCEL. As an organization
expands in size and function, a stage is reached when this bonded structure
become inadequate and inefficient. In Excel each every time the reference
should be made. There are high possibilities to commit errors, which leads to
produce the wrong statements to the management. Report Generation is also not
an easy task.
Limitations of Existing System
There
are a lot of reasons for introducing the new system; they are mainly due to the
drawbacks and inefficiency of the existing system.
1. Not able to operate in a LAN
environment
2. Cannot able to Configure by the user
3. Problems in updating and backup
4. Time Consuming
5. Possibilities of man made errors.
2. Cannot able to Configure by the user
3. Problems in updating and backup
4. Time Consuming
5. Possibilities of man made errors.
PROPOSED
SYSTEM
The system study investigates the problems and identifies alternated
solution, then finally recommends a best solution.
The
system gives the remedy for the troubles given by the existing system.
Advantages of Proposed System
1. The Proposed system is very user friendly and it allows the user to configure the new settings.
2. Stored data and procedures can be easily updated.
3. Accuracy and security of data will be more comfortable for the organization.
4. Due to Validation Check in this proposed system avoids the human errors.
SYSTEM REQUIREMENTS
Advantages of Proposed System
1. The Proposed system is very user friendly and it allows the user to configure the new settings.
2. Stored data and procedures can be easily updated.
3. Accuracy and security of data will be more comfortable for the organization.
4. Due to Validation Check in this proposed system avoids the human errors.
SYSTEM REQUIREMENTS
HARDWARE
REQUIREMENTS
Processor
Type : PENTIUM IV
Processor
Speed : 2.3 GHZ
RAM : 512 RAM
Hard
Disk Capacity : 40 GB
SOFTWARE
REQUIREMENTS
Operating System : Windows XP or Vista
Front End :
Microsoft Visual Studio 2005
Back End :
SQL 2005
Server :
IIS
Language :
Visual C#.NET