Software Project Organization System
OBJECTIVE:
In
software industry, the major problem is meeting the clients requirements with
specific to a software project development is the deliverables that should be
promised to the client. The client standardizes himself to a contract and fixes
a specific time onto the systems, when the project has to be delivered.
Once the software development contract is
signed, the actual task on scheduling the manpower and machine requirements
arises. In scheduling the manpower and machine requirements arise. In a
software development process, if the manpower is not organized properly then it
can cause a great lot of have in reaching the targets.
The
major goal of any software development firm is to meet the targets as fast as
possible with the least manpower, to get targeted profits. The other area where
the software developments firm is development processes.
The
application training the bugs and their associated teases that were developed
previously also plays a vital role. The software project management solutions,
is an application that kinds itself with the overall standards of managing a
project at all levels of its development processes.
The
application is projected towards the maintenance of data that is utmost
necessary to know the state and status of a project that is undergoing through
the process of development. The major intension it’s to maintain the history of
all the components that have been developed for a specific project along with
the associated information about the software engineer who has been involved in
the process of development of that component.
This
type of standard always helps the industry not only in managing the Human
Resources properly but also help to keep down the maintenance upon the system.
The history of information also helps in keeping the standards of bug tracking
and bug management much easier, flexible and faster.
The project has been planned to be having the
view of distributed architecture, with centralized storage of the database. The
application for the storage of the data has been planned. Using the constructs
of MS-SQLServer2000 and all the user interfaces has been designed using the
ASP.Net technologies.
The database connectivity is planned using the
“SQL Connection” methodology. The standards of security and data protective
mechanism have been given a big choice for proper usage.
The
application takes care of different modules and their associated reports, which
are produced as per the applicable strategies and standards that are put
forwarded by the administrative staff. Interested are with respect to the
management of library with specific to the previous project.
EXISTING SYSTEM:
Storing
and ret reviewing of data like employee details, customer details, project
details etc.., is complicated And stored
in different databases.
Ret
reviewing details of the presently working software engineers, Team leaders and
project leaders is slow and complicated and no security.
Data
lost or data misuse can be happened at any level of development of project.
PROPOSED SYSTEM:
The
development of the new system contains the following activities, which try to
automate the entire process keeping in view of the system makes the overall
project management much easier database integration approach.
1.
The contract signed clients details are readily available at any moment when
the information is necessary.
2.
The schedule of the presently working software engineers, Team leaders and
project leaders can be known in a flash of a second.
3.
The generic schedules and the future availability of the man power calculation
can take place in a short time.
4.
There is no risk of data mismanagement at any level while the project
development is under process.
5.
The library search with regard to the previously developed modules will become
much easier and faster.
6.
The associated relationship with respect to a module, component or element
design can be found out very easily and very quickly.
7.
The application at peak stages can make the Bug tracking and maintenance to be
more specific and more proper.
MODULES:
·
Branch Information Module
·
Employee information module
·
Project information management module
·
Package information module
·
Project documentation Module
·
Employee’s performance management module
·
Report designing module
HARDWARE REQUIREMENTS:
Processor : Intel Pentium 4 Processor with
700MHZ or more
Ram : 256 MB or more
Cache : 512 KB
Hard
disk : 20 GB hard disk recommended.
SOFTWARE REQUIREMENTS:
Operating system : Windows 2000 SERVER
Front End Software :
ASP.NET
Code
behind :
VB.NET (Visual Basic .NET)
Validations :
Jscript
Back
End Software : SQL Server 2000